How do you apply all weather roofing on Black Jack?

How long does it take for Black Jack all weather roof cement to dry?

Use proper protection and adequate ventila- tion, when using product. Cure Time (at recommended coverage rate) 4-8 hours to set, 24-48 hrs. to cure depending on surface and weather.

How do you use waterproofing in blackjack?

Apply 2 coats of Black Jack roof coating with a brush, allowing the first coat to dry before the second. First, remove loose chippings. If there are any defects wider than 0.75mm, fill in first with Bitumen Mastic and allow to dry. Any blisters should be opened and cleaned.

How long does Black Jack take to dry?

Allow each coat to dry before recoating: 12-24 hours depending on conditions. Full cure varies from 3-7 days depending on conditions. Full cure before burying is crucial.

How long does it take for Black Jack roof patch to dry?

If mold is present, clean with a proper bleach solution (one part bleach to 2 parts water). Allow roof to dry 24 hours before coating.

What is blackjack paint used for?

Black Jack Black Bitumen Paint is suitable for use on many different substrates such as corrugated iron, fire escapes, stairways, ladders, storage tanks, gutters, downpipes, fences, railings, gates, concrete roofing, stone, brick, concrete screeds, sand/cement surfaces, and for over coating felt/wood.

THIS IS IMPORTANT:  What happens when you win lotto online NZ?